• Start
  • News
  • Store
  • Grand California
    • Community
    • VW Grand California knowledge base
    • GC Hacks
    • GC Adventure
  • Gadgets
  • On the Road
    • Tips & Advisor
    • Places to be
    • Road trips
  • WomoWasch.de
  • Contact
  • Newsletter
  • English
    • Deutsch (German)
    • Svenska (Swedish)
    • Polski (Polish)
    • Nederlands (Dutch)
    • Français (French)
    • Español (Spanish)
    • Suomi (Finnish)
    • Dansk (Danish)
    • Italiano (Italian)
    • Norsk bokmål (Norwegian Bokmål)
  • Start
  • News
  • Store
  • Grand California
    • Community
    • VW Grand California knowledge base
    • GC Hacks
    • GC Adventure
  • Gadgets
  • On the Road
    • Tips & Advisor
    • Places to be
    • Road trips
  • WomoWasch.de
  • Contact
  • Newsletter
  • English
    • Deutsch (German)
    • Svenska (Swedish)
    • Polski (Polish)
    • Nederlands (Dutch)
    • Français (French)
    • Español (Spanish)
    • Suomi (Finnish)
    • Dansk (Danish)
    • Italiano (Italian)
    • Norsk bokmål (Norwegian Bokmål)
View Categories
  • Home
  • GrandCali.com
  • VW Grand California knowledge base
  • Actions / Field measures
  • Service measure 91UD / TPI 2080660/1 – Energy management faulty, batteries are not charged

Service measure 91UD / TPI 2080660/1 – Energy management faulty, batteries are not charged

1 min read

(Grand California Facelift only)

In service measure 91UD with process number 2080660/1, Volkswagen describes a problem in the energy management of the Grand California Facelift. In vehicles from a limited production period, the starter battery and the supply batteries may not be charged correctly.

Validity of the measure

This service measure applies exclusively to Grand California Facelift models. Whether a vehicle is affected is checked via ELSA Pro.

Problem description

According to Volkswagen, the following anomalies may occur in affected vehicles:

  • The starter battery is not charged when charging via shore power
  • The supply batteries are not charged while the engine is running

The problem concerns the interaction between shore power, driving and energy management.

Technical background

Volkswagen cites a faulty configuration in the energy management system as the cause. In some cases, a faulty potential distributor, fuse holder SH, is also installed, which impairs the correct charging process.

Remedy according to service measure

Depending on the vehicle equipment and findings, the following measures are planned:

  • Adaptation of energy management in the control unit for special functions
  • In addition, for certain vehicles, replacement of the potential distributor, fuse holder SH

The measure is divided into two criteria:

  • Criterion 01: Adapt energy management
  • Criterion 02: Replace fuse holder SH

The work required depends on the respective vehicle status.

Duration of the measure

According to Volkswagen, the duration of the service measure is between:

  • approx. 30 minutes if criterion 01 is implemented
  • up to 90 minutes, if criterion 02 is also required
Wie gefällt dir dieser Beitrag ?

Artikel teilen :

  • Facebook
  • X
  • LinkedIn
  • Pinterest
Updated on 31. January 2026
Service measure 23BBService note: “Error: driver’s seat belt” indicator lights up in the instrument cluster – from MJ24 onwards

Powered by BetterDocs

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Instagram

Check out our latest posts on Instagram.

Blogged with love from around the world

Facebook-f Instagram Telegram

Sign up for our Newsletter on!

  • Imprint
  • Privacy policy
  • Contact
  • Imprint
  • Privacy policy
  • Contact

© ZM Media